Commissioning
Installation to handover,
one dedicated team
After delivering the control panels, our own team carries out the entire commissioning process —
on-site installation, wiring checks, software parameter setup, and no-load and load testing.
For marine and offshore projects, we also support class surveys for stable operation.
Proven Track Record
Commissioning experience built at shipyards and offshore plant sites in Korea and abroad
supports a smooth handover and reliable operation.
Total vessels commissioned
Commissioning Process
From installation checks to site handover, every stage is verified for a reliable result.
Installation & Wiring Check
Safe and accurate commissioning starts with a thorough check of the installation and wiring.
Parameter Setup
We set optimal control values for the equipment’s operating conditions and site environment to prepare for stable operation.
No-Load / Load Testing
No-load and load tests before start-up provide final verification of operational stability and performance.
Site Handover
After commissioning, we complete final inspections and operator training, handing over a site that is ready to run.